Vision + Technical Experience = Results

Eagle

 

Eaglesham• Upside 80 drilling locations
• Large land base > 400 sections
• Own 10,000 Bbl/d oil battery and 20 MMcf/d gas plant
• High WI (>80%) and operatorship